More Services
We represent a variety of manufacturers, so the homeowner and
borrower have the option of selecting the best system for the soils
condition of the understructure and for his price criteria.
Generally, the process is as follows:
- Inspection:
The home site and understructure are evaluated to determine the most
cost effective system for the home and the soil condition. Since the
retrofit permanent foundation system is designed to work in conjunction
with the existing pier and pad system, we first must determine the
structural integrity of the current components. The inspection
generally takes no more than 45 minutes.
- Formal Bid:
We will prepare a formal bid at the conclusion of the Inspection and
have it returned no later than the next day. Our bids outline all
expected costs including permits, system installation, filing with
Housing and Community Development, recordation of the documents, cost
of Engineer's Certificate, etc.
- Sign Contract:
Once a contract has been signed and we are assured the underwriter has
all the required information, we are happy to schedule an installation.
- Job completeion:
Most installations can be completed in 1 working day. Some individual
cases may take slightly longer depending on the scope of the job. This
will be stipulated up-front and will entail no hidden costs.
- Signing and Recordation of 433A:
The following business day the local Building Inspector verifies and
signs off on the installation and signs the 433A. In jurisdictions
where we are able, we record the document the same day or next day and
fax it to the lender, underwriter or escrow officer along with the
engineer's certificate (if that is required).
- Billing:
We can be paid out of Escrow! Once the document has been recorded we
will fax, or send the recorded document and a copy of our invoice to
the billing party.
Tags: doublewide foundation mobile home foundation foundation retrofit manufactured home 433A foundation contractors 433A permanent foundation contractors tie-down contractors mobile homes manufactured homes modular homes foundation system foundation intalling a manufactured home foundation blocking system mobile homes FHA/VA Foundation HCD form 433A HUD 1996 Handbook HUD Foundations HUD Standards HUD certified Foundation Systems Recorded 433A |